Route No. 85 (Karmiel)

Arranging Route No. 85 in the section of Karmiel (East) until Nahal Amud Junction to a two-track, two-lane highway with the length of approx. 15 km.

The project will include the following works:
Construction of Road No. 85 in the section of Carmiel (east) until Amud stream Junction, 15.1 km long.
Eliminating junctions and building interchange separators to improve flow of traffic on the main road.
Shzor / Sejor Separator.
Rama Interchange.
Moran Separator.
Hananya / Halfta interchange
Kadarim Separator.
A bridge over the Tzalmon Stream