Ayalon H.W – Dov Hoz

The construction work of the interchange was carried out in the course of three tenders:

Relocation of the Dan Region Association of Towns Sewage line.

Building reinforcement walls lining the right of way in Ayalon roads.

Building the Wolfson – Yoseftal section, including Dov Hoz interchange.

 

Throughout the performance, movement on both tracks (NB-SB) continued to run smoothly, with minimal disturbance