Highway 44 – 208 level seperator

Construction of a level separation between Highway 44 and the railway near the city of Lod. The project was carried out when the rail and main roads operated at all times.

The project included the construction of bridges, retaining walls, drainage ducts, relocation of infrastructure, traffic arrangements, paving of roads, landscaping and landscaping.