Highway 10

Completion of a two-track, two-lane bypass road to Bet Shemesh, connecting roads 38 and 375, with a total length of 10 km, including 5 intersections along the length of the road, the works included earthworks, quarrying, construction of retaining walls, relocation of infrastructure, bridging, paving and development