La Guardia and Hamasger Grade Separation

In the La Guardia and Hamasger Grade Separation Project, a tunnel was built in the junction of the La Guardia, Hamasger, Ha’harash, Rosh-Pina and Levanda streets, to create a two-way, 750-meter long, underpass on the east-west axis.

A direct exit from the underpass to the Ayalon South Highway was built as well. This was one of the most complex projects in the history of Tel-Aviv, both in terms of planning and of operation.