Ra’anana wastewater facility
This advanced institute was built to treat 18,000 cubic meters of wastewater, arriving from the city of Raanana, per day. The chosen operation method was R.B.S.
This advanced institute was built to treat 18,000 cubic meters of wastewater, arriving from the city of Raanana, per day. The chosen operation method was R.B.S.